Past Projects

Below is a selection of projects we are particularly proud of. Of course, every project is important to us, but we want to provide you with a sampling of the boundless possibilities we can deliver.

Project Title Services Duration/Status Customer/Location
Multi-Purpose liaison Bldg in Erbil  Work includes retrofit a 1000 square meter hanger to a residential, entertainment and office bldg. construction of partitions and walls with wood paneling and insulation, full electrical work with EMT conduits, fire sprinkler system, HVAC and drop ceiling, flooring and fire rated doors etc. also construction of covered courtyard and covered parking area with high privacy fencing. 240 Days

US State Department

Erbil-Iraq

Reefer & GYM Facility in Erbil Work includes design and built a steel structure shade 43m x 35m for 27 reefers with removable partial top for services. Also retrofit a steel structure and transform it to a GYM facility. All civil, steel structural and concrete work involved in this project 183 Days

IAP Worldwide Service / US State Department

Erbil-Iraq

Design &  Build MWR & GYM Bldg in Duhok  Work includes design and build a steel structure building that withstand mortar attack a turnkey project from designing to foundations and 100 ton of steel fabrication. All electrical plumbing HVAC work, fire rated material incorporated in all aspects of the building, double roof pre-detonation and protective roof, fire rated insulations with furniture and gym flooring. 275 Days

US State Department

Duhok-Iraq

Installation of HVAC roof top units with complete duct work  Work include supply and installation of Two 6Tons 100% fresh air roof top units. Duct fabrication and installation with volume dampers and fire/smoke dynamic dampers

45 days

Completed

IAP Worldwide Services / US State Department - Sulaimaniya Iraq 
Design/build fire escape inclosed exterior stairs, fire pump building, water tank installation and misc roof repairs Work include the construction of 2 emergency exit steel structured stairs inclosed with insulated metal panels. concrete foundation for the stairs and the construction of a steel structure room that will contains the fire pump system with the emergency water tanks. Water proofing and roof repairs are done to an existing building that is part of the complex

45 Days

Completed

IAP Worldwide Services / US State Department - Sulaimaniya Iraq
Construction of A-housing Project at Erbil Diplomatic Support Center (EDSC Work includes the installation of a total 60 WET CHU with complete infrastructure i.e. electrical network with MDB and 5 SDBs, check and replace all circuit breakers and electrical panels on each CHU, layout and install fresh and grey water system, install HVAC units. Work also include remodeling all the CHUs and convert from 2 bdr 1 bath to 2 bdr 2 bath. Concrete footings and sidewalk installation.

120 Days

Completed

IAP Worldwide Services / US State Department - Erbil Iraq
Construction of K-housing, C-Housing, CP Yard and Lounge projects at Erbil Diplomatic Support Center (EDSC)  Work includes the installation of a total 100 WET CHU with complete infrastructure i.e. electrical network with MDB and 7 SDBs, check and replace all circuit breakers and electrical panels on each CHU, layout and install fresh and grey water system, install HVAC units. Work also include remodeling all the CHUs and convert from 2 bdr 1 bath to 2 bdr 2 bath. Concrete footings and sidewalk installation.

1 Year

Completed

IAP Worldwide Services / US State Department - Erbil Iraq
Security Upgrade  Work includes the design and construction of Window grills, security metal doors and some light room renovation work.

45 Days

Completed

IAP Worldwide Services / US State Department - Sulaimaniya Iraq
Renovation of compound housing S-054  Work includes complete renovation to US Standards. Electrical work, new wiring, new panel, new plugs and switch, lighting, AC units. Also, new plumbing and repair and structural damage. Change all windows and doors. Installation of metal stairs and the construction of new sidewalks.

90 Days

Completed

US State Department - Erbil US Consulate
Design and Construction of Satellite Platform  Work includes the design and construction of a Steel Structure Platform on the roof of a building to hold a 5000 pound communication Satellite.

45 Days

Completed

IAP Worldwide Services / US State Department - Sulaimaniya Iraq
Renovation of compound housing S-060   Work includes complete renovation to US Standards. Electrical work, new wiring, new panel, new plugs and switch, lighting, AC units. Also, new plumbing and repair and structural damage. Change all windows and doors. Installation of metal stairs and the construction of new sidewalks.

60 Days

Completed

US State Department - Erbil US Consulate
Design and Construction for Erbil Council Building (Visa Center) Provide a complete design plans, structural design and calculation to modify an existing building with the addition of new space. Construction works includes, demolition, civil work, mechanical and electrical work.

1 year 

Completed

OBO/ US Department of State - Erbil US Consulate
Field Expedient Protection Improvement Perimeter Security Wall   Perimeter security wall improvement to meet DOS standards. Work includes, but not limited to, infill wall openings, anti-climb fence between and on roof structures, demolish, provide and or improve wall/T-walls, fabricate and install steel fence per client specifications, etc. 

45 days/ completed

 

Regional Security Office - US Consulate/Erbil-Iraq
Renovation of compound housing to meet the national building and safety code in Regional Reconstruction Team Erbil, Iraq Renovation and remodeling 7 buildings to meet US life safety, comfort, and security standards by improve life safety conditions by replacing the electrical, mechanical & plumbing, Voice & Data cabling, and Interior & Exterior remodeling.

60 days 

Finished ahead of schedule

US Embassy/US Consulate General in Erbil-Iraq
Overhaul of (2) Cummins Generators Level One mechanical and Electrical maintenance was performed according to manufacturer's standards. 

50 days

On time

US Embassy/US Consulate General in Erbil-Iraq
Generators - Load Test Dummy load application to 10 different generators under separate PO using our one and only load banks device in Iraq.  N/A  US Consulate General in Erbil-EDSC
Reconfiguration of Residential Building S-056 at the US Consulate Compound in Ankawa Erbil, Iraq  Renovation and remodeling of building S-056 to meet US life safety, comfort, and security standards by improve life safety conditions by replacing the electrical, mechanical & plumbing, Voice & Data cabling, and Interior & Exterior remodeling.

 60 days / 

Finished in 27 days

 IAP Worldwide Services/US Consulate General in Erbil-Iraq
Renovation Of Property No. S-057 (Parking Lot) at the US Consulate Compound in Ankawa Erbil, Iraq  Resurfacing the parking lot of building S-057 with T-walls relocation

 30 days

Completed

 US Embassy/US Consulate General in Erbil-Iraq
COS Erbil Utilities infrastructure Improvements  The commissioning of 16 containerized housing units (CHUs) and enables a self-sustained camp at COS Erbil. Project involves supply and installation of the electrical system, fresh water and black water.  45 dayy / finished in 24 days  DynCorp International/COS Erbil 
Upgrade of 13 Compounds at camp Bucca  Upgrade of 13 compounds at camp Bucca, concrete work, Fence construction, ECP gates, power generation, electical work, lighting pole, guard towers, medical units, latrine and shower units, HVAC, and CCT units. Managed by WAGCCO CEO   120 days / on time  Joint contracting command-Iraq,JCCI-Construction Sector-Baghdad,Iraq/Basrah
Housing 1800 personnel camp at Basmaya Range Complex, 30 mil southeast of Baghdad  Fully compeleted 1800 personnel camp, with semi-hardedend structured DFAC's, motor pool, open bay class room, 2 BN12x36meters covered class room and offices, 16 open bay sunshade 6x10m classroom, and bathrooms. Managed by WAGCCO CEO   60 days / on time  PCO, joint contracting command-Iraq/Afghanistan,JCCI-phoenix Base-Baghdad,Iraq, APO AE 09348/Basmaya
Construct one 1500 personnel camp in 2 Battalions sized 750 personnel compounds.  Fully compeleted 1500 personnel camp, with semi-hardened structured DFAC's, motor pool, open bay class room, 2 BN12x36meters covered class room and offices, 16 open bay sunshade 6x10m classroom, and bathrooms. Managed by WAGCCO CEO   45 days / on time  Joint contracting command-Iraq/Afghanistan,JCCI-phoenix Base-Baghdad,Iraq
Construct a 450 man tent a 144 man trailer city and training classrooms, and provide infrastructure for Iraqi security forces located at Dublin camp, victory base complex (VBC) in Baghdad-Iraq.  Construct a 450 man tent,a 144 man trailer city and training classrooms, and provide infrastructure for Iraqi security forces. Managed by WAGCCO CEO   90 days / on time  Joint contracting command-Iraq/Afghanistan, JCCI-phoenix Base, Baghdad-Iraq.
 Full range of life support  Full range of life support which includes electrical, power generation through 126 generators, Food service operation through multiple DFAC's, water supply, Waste water treatment plant maintenace to support CMATT & areas like Orange Zone, National Depot in the Tadji Military Base. Managed by WAGCCO CEO  Annual Contract  Joint Contracting Command-Iraq & Afghanistan, Baghdad, Iraq.
       

 

 

 

Project Showcase: Challenges and Solutions

Contact Us

Please call us at:

 

info@wagcco.com 

 

Or use our contact form.

Project Showcase

Flexibility, innovation, results: See for yourself how we have built the success of our clients. Click below to explore our past projects.